The Brief:
The project involved constructing an ISO 8 cleanroom facility, complete with integrated changing rooms, tailored to the needs of a client in the medical moulding sector. A key requirement was the installation of a 5-tonne crane system designed to access all machine locations within the space, ensuring operational flexibility and efficiency.