Having successfully collaborated with us on a prior cleanroom project, the client once again placed their trust in our turn key project expertise to deliver results with confidence and consistency.
The project involved constructing an ISO 8 cleanroom facility, complete with integrated changing rooms, tailored to the needs of a client in the medical moulding sector. A key requirement was the installation of a 5-tonne crane system designed to access all machine locations within the space, ensuring operational flexibility and efficiency.
A key challenge in the project was navigating the local authority approval processes. All technical services—including sprinkler systems and electrical installations—were required to comply fully with these regulatory standards to ensure successful sign-off and operational readiness.
Working with our client and local partners, we successfully delivered a high-quality new facility tailored to their operational needs. Following the project’s success, the client returned to engage us in developing expansion plans to support their growing business.
Enter your details, along with information about your project, and we’ll be in touch to discuss this further with you.
Get in touch
The best way to get in touch with us, use the contact form here and we'll be in touch to arrange a site visit